Skip to main content
← Methodologies
Family F04 · Pollution PreventionMCC-MCUAPPROVEDRegister version 1.1

Marine Gear Loss Prevention (Ghost Gear Recovery)

Code MCC-M008

This code denotes a different methodology in the standard that locks it. MCC-200 v2.0 cl. 0120, locked portfolio gives M008 to Marine Plastic Pollution Prevention. The methodology on this page is the one in the register and the one a verifier can actually assess, but the code alone does not identify it.

Every meaning of every code is recorded in the code register. Resolving it is before the Governing Board.

Avoided-input credits for marine plastic, ghost-gear and agricultural-runoff prevention, quantified by mass of pollutant prevented from entering the marine environment with chain-of-custody verification.

Methodology overview

Recovery and prevention of lost/abandoned fishing gear. Credit basis per founder direction 2026-08-24 (position A, pending board ratification D6): Marine Conservation Units on a mass/area basis — kilograms of gear verifiably recovered or prevented, with hectares of seabed cleared reported separately. No carbon or climate claim forms part of the credit; avoided emissions may be documented as separately quantified informational disclosure only (umbrella methodology §11.12). [FD-2026-08-24, sak D6: kredittgrunnlag posisjon A — MCC-MCU på masse/areal uten klimapåstand; 1 MCU = 100 kg verifisert masse; usikkerhetsbuffer 10 % til første verifikasjon. Styreratifisering utestående.]

Eligibility criteria

  • ●Activity prevents pollutant entry to the marine environment — collection downstream of marine entry is excluded except for ghost gear in active fishing zones.
  • ●Mass-balance accounting from source to interception point with documented chain of custody.
  • ●Pollutant types limited to: macro / micro plastics, abandoned / lost fishing gear, and quantifiable agricultural nutrient runoff (N, P).
  • ●Project activity is not legally mandated or already remunerated under EPR or polluter-pays schemes.
  • ●End-of-life processing is verified — landfill or incineration without energy recovery does not qualify; accredited recycling or material recovery required.
  • ●Permanence Option C: buffer pool drawdown to cover misclassification and double-count risk.
  • ●Contribution-first claims; no neutralisation of any party's pollution footprint.

Quantification approach

Carbon pools and crediting metrics

  • ●Avoided plastic-degradation methane / CO2 (very small, reported only)
  • ●Avoided processing emissions (where recycled material displaces virgin production — verified, not assumed)

Equations (in plain language)

  • 1.Prevented mass = (mass intercepted, kg) × (counterfactual escape probability) — counterfactual is regional and conservative.
  • 2.Function gain = (prevented mass, kg) × (gear-class or polymer-class mortality / impact coefficient).
  • 3.Avoided-emission informational disclosure = (mass recycled, t) × (lifecycle delta vs virgin production, kg CO2e / t) where the recycler provides chain-of-custody documentation. Never part of the credit and not usable in any buyer claim.
  • 4.Double counting check: serialised manifest, GPS-tagged collection waypoints and intake-weighbridge records all required before issuance.

Reference methodology — starting point

Reference points include UNEA-resolved guidance on plastic pollution monitoring, the GESAMP marine litter assessment frameworks and FAO ghost-gear marking guidelines. These are starting references being improved upon — MCC F04 adds mandatory chain-of-custody and EPR-overlap testing.

Where MCC improves on the reference

  • ✓Hard EPR / polluter-pays overlap test at PDD stage and re-tested annually.
  • ✓Serialised, GPS-tagged manifest required from collection waypoint to recycler intake.
  • ✓Counterfactual escape probabilities are regional, not global averages.
  • ✓Function-equivalent outcomes (avoided mortality from plastic / ghost gear) are the crediting unit; avoided-emission figures are informational disclosures only — no carbon claim forms part of the credit.
Buffer pool
10%
Fixed by FD-2026-08-24 item D6 (1 MCU = 100 kg verified mass, 10% buffer).
Crediting period
5 years
5-year crediting period given regulatory environment evolution (EPR, plastics treaty). Re-application required — no automatic renewal.

Monitoring requirements

Required data sources

  • ●Weighbridge intake records — every consignment, signed by accredited operator
  • ●GPS-tagged collection waypoints — every collection event
  • ●Drone or satellite verification of collection sites — quarterly
  • ●Polymer / gear-class characterisation samples — every 1,000 kg or quarterly
  • ●Recycler material-flow report — quarterly, with mass-balance reconciliation
  • ●Water-quality monitoring (N, P) for runoff projects — continuous in-stream sensors
Frequency
Per-event (collection / weighbridge); quarterly aggregation; runoff projects continuous.
Verification cadence
Independent verification annually. Mass-balance discrepancy of more than 3% triggers immediate audit.

KPIs that must be tracked

Mass intercepted (kg) by classMass recycled / recovered (kg)Counterfactual escape probability (regional)Function-equivalent units (avoided mortality)Chain-of-custody integrity score (% complete manifests)Mass-balance variance (%)

Eligible co-benefits — SDG mapping

F-family F04 contributes to the following Sustainable Development Goals. Indicators flagged as required must be reported at every verification; optional indicators may be claimed where the project chooses to report them.

GOAL 1414
RequiredSDG 14Life Below Water
GOAL 1212
RequiredSDG 12Responsible Consumption
GOAL 66
OptionalSDG 6Clean Water & Sanitation
GOAL 1111
OptionalSDG 11Sustainable Cities
GOAL 88
OptionalSDG 8Decent Work & Growth

Public consultation and community engagement

30-day public consultation. Where collection involves informal-sector workers, a documented just-transition / decent-work plan is required and re-confirmed at every verification. EPR-overlap audit results are published with the consultation.

Adopted documents and version history

The binding text for this family is the adopted guidance published at /transparency/documents, together with the register entry above. Version history is carried by those documents, not by this page.

Projects using this methodology

Registry projects will appear here once registered

No registered project uses this methodology yet.