Skip to main content
← All consultations
RULE CHANGE · Tier 5 — Operational policies, procedures, templates, guidanceOPEN FOR COMMENT

VVB Accreditation — Assessment Report Templates v1.0

New operational templates under MCC-400 v1.1 Section 4: Desk Review Report (art. 20–22), Competence Assessment Record (art. 23–25), Witness Audit Report (art. 26–28), Accreditation Decision Record (art. 29)

Opened 26 August 2026Closes 9 September 2026 · 14-day notice (floor 14)10 days left

What is being consulted on

The four records the accreditation register cites as the basis for each transition: what the assessor examined at desk review, how each Lead Auditor was assessed, what the witness audit observed, and the decision with its conditions and reasons. Written to the articles of MCC-400 v1.1 so an accreditation can be audited from the file alone.

Decision by
Programme administration under FD-2026-08-24 item 3, with Board oversight (MCC-001 cl. 0083)
After closing
Every material comment receives a written response; the closing protocol is published here; the decision cites the proposal by its hash; on adoption the text is published at /transparency/documents with a version bump and this consultation is linked from it.
Proposal SHA-256
9c2ca6edf58f38dbec61d0baa640a94931bcf5ff0d45316c0a027e5847cb3829
Source file
MCC_VVB_Accreditation_Assessment_Report_Templates_v1.0_DRAFT.md

Proposal text hash 9c2ca6ed…47cb3829

MCC VVB Accreditation — Assessment Report Templates v1.0

Instrument: Operational templates under MCC-400 v1.1 Section 4 (Tier 5; 14 days' notice, MCC-001 cl. 0083): (A) Desk Review Report (art. 20–22), (B) Competence Assessment Record (art. 23–25), (C) Witness Audit Report (art. 26–28), (D) Accreditation Decision Record (art. 29; MCC-100 cl. 0144–0145) Status: v1.0 DRAFT for adoption under FD-2026-08-24 item 3 — NOT ADOPTED. Put to 14 days' public consultation on 26 August 2026 (Tier 5, MCC-001 cl. 0083). Prepared: 25 August 2026 · Used with: the accreditation register at /portal/admin/vvb (each transition records who, when and on what basis; these reports are the "basis")


A. Desk Review Report (MCC-400 art. 20–22)

A.1 Identification. Applicant body · registry accreditation id · assessor (name, appointment date, art. 19) · desk review period (start; completion within 30 business days, art. 21) · application SHA-256 as signed (D10).

A.2 Completeness against art. 18 (a)–(h). One row per item: provided / provided after request (date of request, date of response — 15 business days, art. 21) / not provided. The platform's art. 20 checklist (evaluateApplication) is attached as the starting point; the assessor confirms or corrects each line with the evidence examined (file, page).

A.3 Eligibility (art. 13–16). (a) Legal entity in good standing — register extract checked, date. (b) ISO 14065 accreditation — certificate, scope, accreditation body, expiry, verified with the issuer (date, method); or equivalent programme accreditation → provisional route (art. 14). (c) Marine/coastal/blue-carbon experience — engagements examined. (d) Independence (art. 15) — ownership, clients, declarations examined; conflicts identified. (e) Insurance (art. 16) — insurer, policy, limits ≥ USD 2 m / 5 m, period; or equivalent cover proposed for the Programme Administrator's acceptance, with reasons.

A.4 Quality management (art. 18(d)). Standard followed; internal review before submission; document control; complaints handling; how the body would apply MCC-400 Sections 9–10 and Addendum 1 (AI-augmented engagements, art. 95–105).

A.5 Proposed Lead Auditors and Technical Experts (art. 18(c), 39, 25). Table: name · degree · ISO 14064-3 certification · years GHG V/V · families proposed · marine experience · art. 39 met on paper (Y/N) · to proceed to competence assessment (Y/N).

A.6 Findings. Non-conformities (numbered; requirement; evidence; what is required to close) · observations · information requests outstanding.

A.7 Recommendation (art. 22). Proceed to competence assessment for the auditors listed / do not proceed (reasons; art. 29(c) denial with reasons follows if the Programme Administrator agrees) / proceed on the provisional route (art. 14, 35).

A.8 Assessor's declaration. No conflict of interest with the applicant (MCC-700 §13); signed in the registry (name + hash).

B. Competence Assessment Record (MCC-400 art. 23–25) — one per Lead Auditor

Auditor · families applied for · (a) Technical examination — date, paper reference, score (≥ 70 % to pass, art. 24), areas of weakness · (b) Case study — case reference (a simulated MCC PDD or MR seeded with non-conformities and quantification errors), non-conformities planted / identified, quantification errors planted / identified, assessor's rating · (c) Interview — date, panel, topics (MCC-100, MCC-200, the family methodologies, MCC-400, MCC-850 and the AI layer), rating · Outcome — approved for families [ ] / not approved (retake after 90 days, art. 24) · Technical Experts: evidence of qualifications and ≥ 5 years' experience examined (art. 25).

C. Witness Audit Report (MCC-400 art. 26–28)

C.1 Engagement witnessed. Project · validation or verification · actual or simulated · dates · VVB team (lead, experts) · MCC-appointed witness assessor.

C.2 Evaluation (art. 27). For each of (a) application of the methodology, (b) evidence gathering and sampling (Addendum 1 art. 99–103 minimum sampling where the AI layer was used), (c) site-visit procedures, (d) findings identification and communication, (e) quantification review (including the project-specific buffer rate and, for MCU projects, the unit basis), (f) report quality and completeness (Validation/Verification Report Templates v1.0): what was observed, conformity (conforms / minor NC / major NC), evidence.

C.3 AI-layer conduct (Addendum 1). Whether the team treated AI findings as input rather than conclusion (art. 104–105); whether disagreements were documented; sampling performed independently of the AI score.

C.4 Findings and corrective actions. Numbered; severity; closure requirements and deadline.

C.5 Recommendation (art. 28). Full accreditation / provisional accreditation with the conditions listed (art. 35–36: peer review of every report, ≤ 3 engagements a year, witness audit within 12 months) / denial with reasons.

C.6 Assessor's declaration. As A.8.

D. Accreditation Decision Record (MCC-400 art. 29; MCC-100 cl. 0144–0145)

Applicant · decision: full accreditation / provisional accreditation (conditions, deadline for each) / denial (reasons; appeal route MCC-700 §15, 30 days) · scope granted: families [ ], services [ ] · approved Lead Auditors by family (art. 40) · expiry (5 years, art. 10; cl. 0145) · basis: Desk Review Report (hash), Competence Assessment Records (hashes), Witness Audit Report (hash) · decided by (role; not the assessor — MCC-100 cl. 0039) · vote where a body decided · date · registry transition reference (the action recorded at /portal/admin/vvb/[id]) · publication: the public register at /transparency/vvbs is updated on the decision; the decision record is published with personal data redacted (MCC-700 §14.3).

E. Renewal (art. 77–78) and scope extension (art. 33)

Use A (desk review of the renewal application and the performance record, Section 11) and, where warranted, C. Scope extension uses B for the new family and A.3(c) for family experience.

Change log — v1.0 DRAFT (25 Aug 2026): first issue.

Public comments 0 received · 0 answered

No comments have been submitted yet.

Submit a comment

Your name, organisation and comment are published. Your email address is not published; the programme uses it only to respond to you about this comment.